Sign OS
  • Features
  • Trade Link
  • Integrations
  • Compare
  • Pricing
  • Guides
  • About
☰
  • Features
  • Trade Link
  • Integrations
  • Compare
  • Pricing
  • Guides
  • About
  • Sign in
Sign inStart free trial
Sign OS

Job management software for sign shops. Built in Victoria by someone who’s done the jobs.

Product

  • All features
  • Trade Link
  • Pricing
  • Integrations
  • What's new
  • Status

Compare

  • vs shopVOX
  • vs CoreBridge
  • vs SignTracker
  • vs Hexicom
  • vs Cyrious Control
  • vs Ordant
  • vs PrintPLANR
  • vs WorkflowMax
  • vs Printavo
  • vs tradie job apps

Resources

  • Sign shop guides
  • Free templates
  • Overhead calculator
  • Landed cost calculator
  • Blog
  • Help centre

Company

  • About
  • Contact
  • Your data
  • Terms
  • Privacy
  • For installers
  • For suppliers
© 2026 Sign OS · Run by Todd Farrell, sole trader · Victoria, Australia · ABN 50 613 736 709Prices in AUD · Sign in
Help/Quoting/Revise a sent quote
Quoting11 of 15How-to

Revise a sent quote

The quote has gone and the customer wants a different price or quantity. How do I change it?

For
Anyone who quotes
Where to find it
Sidebar › Quotes › open the sent quote
Takes
A couple of minutes
You need
A login that can make quotes

What it is for

Once a quote has gone, its pricing is locked. To change a price, quantity or size, make a new revision: a copy you can edit and send again, kept with the earlier versions. When the newer one has gone to the customer, the older one says Replaced by on the quote page and on its PDF, so nobody goes ahead on an out-of-date price.

After this you can

  • Re-price a quote the customer already has
  • See every version of a quote in one place
  • Know which version is the current one

Before you start

  • The quote has been sent. A draft is changed in the quote builder, and an accepted quote is changed on its job.

Step by step

  1. 1

    Open the sent quote

    Go to Quotes in the sidebar and click the quote's row.

  2. 2

    Press Create new revision

    Press Create new revision, then confirm.

    You’ll seeThe quote builder, open on the new draft. Its number ends in -R1.

  3. 3

    Make the change and send it

    Change what the customer asked for and press Email quote.

    You’ll seeThe new revision reads SENT. The older one now reads REPLACED BY and names the new one.

  4. 4

    Check which version is which

    Open either version. Both list every revision.

    Quotes›Q-321, the older version
    An older revision of a quote with five numbered parts
    1. 1Replaced bySays this version is out of date and links to the newer one. Its PDF carries the same warning at the top.
    2. 2Draft, Sent, ReplacedWhere this version got to.
    3. 3Quote revisionsEvery version of this quote. The newest one sent is the current one.
    4. 4Create new revisionStarts another version. If a draft revision is already open, it opens that one.
    5. 5Mark as acceptedStill there in case the customer goes back to this version. Sign OS asks you to confirm first.

The newer version

The same quote, one revision on.

Quotes›Q-321-R1, the newer version
The newer revision of the same quote with two numbered parts
  1. 1The revision's numberThe original number with -R1 on the end. The next would be -R2.
  2. 2Quote revisionsLists the older version and says it was replaced by this one.

Words on this screen

Revision

One version of a quote. Revisions of the same quote stay together.

Replaced by

A newer version has gone to the customer, so this one is out of date.

-R1, -R2

How revisions are numbered. Your shop can give each revision its own quote number instead, under Settings, then Quotes & invoices.

Tips

For a wording change only, you do not need a revision. Change the wording on the sent quote instead.

Searching the quotes list for the revision's number, such as Q-1001-R2, finds that revision.

Watch out

Only one revision of a quote can ever be accepted. Once one is, the others that were sent are marked declined and Create new revision is gone. Quote more work for the same customer with Copy to new quote.

Common questions

The customer wants to go ahead on the older price. Can I accept that one?+−

Yes. Open the older revision and press Mark as accepted. Sign OS tells you which version is the latest and asks you to confirm before it makes the job.

What happens to the other versions when one is accepted?+−

Every other sent revision is marked declined, with a note that the customer went with another option, so no reminders go out on them. Drafts are left alone and nothing is emailed.

Can each revision have its own quote number?+−

Yes. Turn on Give each revision its own quote number under Settings, then Quotes & invoices. The revisions still stay together.

Open this in Sign OS →

Where to next

Before this

Review and send the quoteCheck the totals and margin, then Email quote. It only shows as Sent once the email has gone.

Next step

Turn an accepted quote into a jobThe customer said yes: one press makes the job.

Related

Change the wording on a sent quoteFix a sign's name or description, or the quote's project name, after the quote has gone, without a new revision.Set how quotes and invoices workDocument numbers, the proof page, deposits, payment details, credit terms and who signs off what.The quotes list and what each status meansEvery quote from draft to accepted, and what each status means.
Also found by searchingrevisionrevisenew revisionreplacedolder versionquote numberR1re-quotedeclinedoptionschange price

On this page

  1. Step by step
  2. The newer version
  3. Words on this screen
  4. Tip and watch out
  5. Common questions
  6. Where to next