Change the wording on a sent quote
The quote has gone and the customer wants a word changed. Do I have to re-quote it?
- For
- Anyone who quotes
- Where to find it
- SidebarQuotesopen the sent quote
- Takes
- Under a minute
- You need
- A login that can change quotes
What it is for
Customers often ask for a small wording change before they order, like adding an S to Toilets. Once a quote is sent its pricing is locked, but each line's name and description can still be changed on the quote page. The price, quantity and size stay as they were.
After this you can
- Fix a line's name or description without a new revision
- Change the name the whole quote is known by
- Send the customer the corrected quote
Before you start
- The quote has been sent. A draft is changed in the quote builder, and an accepted quote is changed on its job.
Step by step
- 1
Open the quote
Go to Quotes in the sidebar and click the quote's row. Each line reads as it does on the printed quote, so you can go through it with the customer.
- 2
Press Change name or description
It is under the line you want to change.
- 1NameThe line's name on the quote.
- 2DescriptionWhat the customer reads under the name.
- 3Job sheet wordingWhat the workshop reads once it is a job. The customer never sees it.
- 4Save and CancelSave keeps the new wording. Cancel leaves the line as it was.
- 3
Change the words and press Save
Change the name, the description, or both, then press Save.
You’ll seeSign OS asks whether to send the customer the updated quote.
- 4
Send the updated quote, or leave it
Press Email PDF to check the address and send the new version, or Not now if they are about to accept anyway.
- 5
To rename the whole quote instead
Press Change project name beside the name at the top, type the new name and press Save.
- 1Project nameThe name the quote is known by: the top of the page, the Quotes list, the PDF and the email subject.
- 2Save and CancelSave renames the quote. Nothing else on it changes.
Tips
Every change is kept in the quote's history with what the line said before and after, so you can see what the customer was first sent.
The quote PDF always prints the latest wording, and accepting the quote carries it onto the job and the job sheet.
Watch out
This is for words only. A different price, quantity or size needs a new revision.
Renaming a line does not rename the quote, and renaming the quote does not rename its lines.
Common questions
The quote is already accepted. Where do I change the wording?
On the job. Open its Ordered tab and press Change name or description on the line. The project name changes with Edit at the top of the job.
Does the customer get told about the change?
Only if you press Email PDF after saving. Not now changes the quote without sending anything.
Can I show or hide what each line is made of?
Yes. Show breakdown beside a line opens its parts and their prices, and Show all breakdowns opens every line at once.

