Keep a plant & equipment register
How do I keep track of every machine, its services, its repairs and who to call when it breaks?
- For
- Whoever keeps the registers, safety contacts and HR people
- Where to find it
- SidebarHR & SafetyPlant & equipment
- Takes
- 10 minutes a machine
- You need
- A plan with safety records
What it is for
Printers, routers, laminators, the forklift, EWP, ladders and vehicles all need their manuals, their safe work procedures and their services. The register keeps them in one place with when and where each was bought, its warranty and who to call when it breaks, puts the next service on the planner, reminds the safety contacts and the register keepers before a service or the warranty runs out, keeps your own record of every repair and service, and lets you tag a machine out of service.
After this you can
- Add a machine with its details, warranty and who to call for repairs
- Add its manual and safe work procedure
- Set a service schedule and log each service
- Log a repair with the cost and downtime
- Tag a machine out of service
Before you start
- Your shop's plan includes safety records. Whoever keeps the registers (production managers to start with), the safety contacts and HR add and change machines and log services. Staff can look if your shop lets them.
The Plant & equipment screen
- 1Add a machineFor whoever keeps the registers.
- 2The four countsMachines, out of service, services due soon, and overdue.
- 3Needs attentionMachines tagged out, and services due, with a link to log each.
- 4The registerEvery machine with its kind, make and model, where it is and its next service.
- 5A machineClick it to open its documents, servicing and log.
Step by step
- 1
Add a machine
Go to HR & Safety, then Plant & equipment, and press Add a machine.
- 2
Fill in what it is
Fill in what it is and where it lives, pick its department, and the tickets needed to use it. Add when it was bought, the warranty end and who to call for repairs, and save.
- 3
Add its documents
On the machine, add the manual and safe work procedure under Manuals and procedures.
- 4
Add a service schedule
Press Add a service schedule. Say what the service is, how often and when it's next due. Add the hours it takes the machine out if it comes off the floor.
You’ll seeThe next service shows on the register and on the planner.
- 5
Log a service
When the service is done, press Log this service, fill in what was found and done, and attach the report.
You’ll seeThe next due date rolls forward from the day it was done.
- 6
Log a repair
When something breaks, press Log a repair and record the issue, the work done, parts, cost and downtime. Add your own photos if the company sends no report.
- 7
Tag it out
If a machine can't be used, press Tag out of service and say why. Press Back in service when it's fixed.
You’ll seeA red Don't use it banner on the machine.
Plant & equipment list
| Part | What it does |
|---|---|
| Add a machine | For whoever keeps the registers, the safety contacts and HR. |
| Machines, Out of service, Due in N days, Overdue | How many machines, how many are tagged don't use, and services coming up or overdue. |
| Needs attention | Machines out of service with the reason, and services due, with Log it. |
| The register | Each machine: In service or Out of service, Overdue, Due soon or Scheduled, kind, make and model, where it is, and its next service. |
Adding a machine
| Part | What it does |
|---|---|
| Name, Kind, Make, Model, Serial number, Asset number, Where it is | What it is and where to find it. |
| Department (optional) | Service downtime comes off this department's hours on the planner. |
| Who may use it | The licences or tickets needed. Shown on the machine as a guide; it doesn't stop anyone using it. |
| Its costing machine (optional) | Links it to the machine you price with. It changes no prices. |
| Purchase date, Purchase price, Bought from | When and where you bought it. Pick the supplier from your suppliers, or choose Not a supplier and type the name. Only the people who keep the register see the price. |
| Who to call for repairs, Add a repairer | The companies you call when it breaks, in order: the first is the usual one. Pick each from your suppliers (their phone, email and contact person come from the supplier record, so a change there shows here) or choose Not a supplier and type the name, phone and email. Add a note like After-hours or Electrical only. Move up and Move down change the order. |
| Warranty ends, Show the warranty end on the planner | The safety contacts and the register keepers get a reminder a month before and on the day. Tick the box to show the date on the Planner as well (it takes no capacity). |
One machine
| Part | What it does |
|---|---|
| Tag out of service, Back in service | Asks why, as it reads on the tag, and shows a red Don't use it banner. |
| Manuals and procedures | The manual, safe work procedure and other documents. |
| Details | Make and model, serial and asset numbers, where it is, department, costing machine, when it was bought and from whom, the price (the register keepers only), the warranty with In warranty, Warranty ending soon or Out of warranty, and who may use it. |
| Who to call for repairs | Each repairer in order, marked Call first when there's more than one, with their note, who to ask for, and their phone and email. Tap a number to ring it or an email to write to them. Everyone who can see the machine sees this, staff included when your shop lets staff see the register. |
| Servicing, Add a service schedule | What the service is, every how many days or months, next due, and hours it takes the machine out. |
| Log this service, Log a repair | Opens the log form. Choose Scheduled service or Repair, then the date, the company that did it (the machine's repairers come first, then your suppliers, or type it), the technician, the issue found, the work done, parts replaced, cost, downtime in hours, comments, and photos or the service report. The issue or the work done is needed for a repair. Logging a scheduled service rolls its next due date forward from the day it was done. |
| Regulations & references | The regulations and codes of practice linked to this machine from Regulations & references. Staff only see it when something is linked. |
| Repair and service log | Every repair and service, newest first, marked Scheduled service or Repair, with everything recorded and its photos and files. The register keepers can add the report or photos to an entry later. Cost shows to them only. Being tagged out and added to the register show here too. |
| Sold or scrapped | Takes it off the register and stops reminders; the history is kept. |
Tips
Every service due date shows on the planner without taking capacity. With downtime hours and a department, it also takes those hours off that department that day.
Pick repairers from your suppliers so their phone and email stay up to date. The first on the list is the one to call first.
Service companies rarely send a report, so the log is your own record. Photos of the fault and the fix are worth adding.
Production managers can add machines and log services from the start. To let someone else, or stop someone, open them under Users and set Keep the chemical and plant registers to Edit or Hidden.
Watch out
Who may use it is shown on the machine as a guide. It doesn't stop anyone using it.
Tagging a machine out of service doesn't change the planner or reminders. Move the work yourself.
This register is separate from the machines you price with. Linking them only keeps the two matched up and changes no prices.
A service with downtime goes on the planner as the person logging it. Someone whose login can't change the planner still saves the service, and is told to ask the office to add it.
Only the people who keep the register see the purchase price and repair costs.
