Sign OS
  • Features
  • Trade Link
  • Integrations
  • Compare
  • Pricing
  • Guides
  • About
☰
  • Features
  • Trade Link
  • Integrations
  • Compare
  • Pricing
  • Guides
  • About
  • Sign in
Sign inStart free trial
Sign OS

Job management software for sign shops. Built in Victoria by someone who’s done the jobs.

Product

  • All features
  • Trade Link
  • Pricing
  • Integrations
  • What's new
  • Status

Compare

  • vs shopVOX
  • vs CoreBridge
  • vs SignTracker
  • vs Hexicom
  • vs Cyrious Control
  • vs Ordant
  • vs PrintPLANR
  • vs WorkflowMax
  • vs Printavo
  • vs tradie job apps

Resources

  • Sign shop guides
  • Free templates
  • Overhead calculator
  • Landed cost calculator
  • Blog
  • Help centre

Company

  • About
  • Contact
  • Your data
  • Terms
  • Privacy
  • For installers
  • For suppliers
© 2026 Sign OS · Run by Todd Farrell, sole trader · Victoria, Australia · ABN 50 613 736 709Prices in AUD · Sign in
Help/Quoting/Adjust a quote line's hours or costs
Quoting15 of 15How-to

Adjust a quote line's hours or costs

This job needs less labour, or a dearer material, than the product allows for. How do I change it on this quote only?

For
Anyone who quotes and can see costs
Where to find it
Quotes › Build quote › open a line › Breakdown
Takes
A minute
You need
A login that can make quotes

What it is for

A particular job may need less labour or a different material cost than the product's standard recipe. The line's Breakdown lets you change those figures on this draft quote only. The product itself does not change.

After this you can

  • See what a line's price is made of
  • Change the hours or the cost of one part of it
  • Add labour or material the product's choices do not cover

Before you start

  • The quote is a draft, and the line has been priced with Calculate.

Step by step

  1. 1

    Open the line and press Breakdown

    Open the product line, scroll to the bottom and press Breakdown, beside Calculate.

    Build quote›Corflute Sign›Breakdown
    The line breakdown with six numbered parts
    1. 1Component, Cost, SellOne row for each part of the recipe. Cost only shows if your login can see costs.
    2. 2A rowThe part's name, with its hours or how much is used underneath, then what it costs you and what it sells for.
    3. 3The pencilChanges that row for this quote only.
    4. 4Item totalThe line's cost and sell price after any changes.
    5. 5Add labour or materialAdds a row for work or stock the product's choices do not cover on this job.
    6. 6Gross margin, Markup, Total markupWhat you make on the line. Read it before you send.
  2. 2

    Press the pencil on the row you want to change

    Type new hours, or a new cost. Fill in one and the other follows.

    Build quote›Breakdown›change a row
    A breakdown row opened for changing, with four numbered parts
    1. 1HoursHow long this part takes. On a material row this is the quantity used.
    2. 2Cost, ex GSTWhat this part costs you. Type a cost instead and the hours follow.
    3. 3The rateSays the rate the cost is worked out at. The sell price always follows at the line's own markup.
    4. 4Save and CancelSave keeps the change on this quote.
  3. 3

    Press Save

    Press Save.

    You’ll seeThe row turns red with an Edited tag, and the calculated figures show crossed out beside the new ones.

  4. 4

    Check the total and margin

    Read Item total and the margin at the bottom, then press Close. Each change is already saved.

Words on this screen

Breakdown edited

A red tag on a line once any row has been changed by hand.

Edited

Marks a changed row. The calculated hours, cost and sell show crossed out beside the new ones.

Put back to…

Shown when you open a changed row again. It returns the row to its calculated figure.

Tips

To add something the choices do not cover, like extra weeding, press Add labour or material, pick Labour or Material, type or search the name, fill in the hours or quantity and press Add.

Small hours also read in minutes, so 0.09 h shows as 6 min.

Watch out

This never changes the product. If you make the same change every time, change the product instead.

A locked selling price, or a price you typed for the line, still sets what the customer pays. A change here then moves your cost, not the price.

Minimum charges still apply. A row never costs less than its minimum.

Common questions

What happens to my changes if I press Calculate again?+−

Changes that still match a row are kept. If a row you changed no longer exists because you picked different choices, a notice tells you.

Do the changes carry to the other quantities I am offering?+−

Yes. Each quantity is priced the same way, with your changes and any markup on the whole quote.

Can I see the breakdown from the review screen?+−

Yes. Each priced line on Review & send has its own Breakdown button.

Open this in Sign OS →

Where to next

Before this

Add a product line and price itPick a product, set size, quantity and choices, press Calculate.

Next step

Review and send the quoteCheck the totals and margin, then Email quote. It only shows as Sent once the email has gone.

Related

Build a custom lineA one-off sign that is not in the catalogue, priced from what goes into it.Build a productA priced recipe of material, work and choices that anyone can quote in seconds.
Also found by searchingbreakdownhourscost overridelabourestimateeditedadd labouradd materialchange cost

On this page

  1. Step by step
  2. Words on this screen
  3. Tip and watch out
  4. Common questions
  5. Where to next