Log a process change and retrain people
We've changed how we do something. How do I record it and make sure everyone is retrained?
- For
- HR people, and staff on the retraining list
- Where to find it
- SidebarHR & SafetyProcess changes
- Takes
- 10 minutes a change
- You need
- A plan with the Safety system
What it is for
When the way you do something changes, write it down: what changed, why, the safety check done first, who signed it off, and who needs retraining. The change closes itself once everyone on the list has confirmed they've been shown the new way.
After this you can
- Log what changed, why, and the safety check done first
- Sign the change off
- Have everyone it affects confirm they've been shown the new way
- Know when a change closes
Before you start
- Your shop's plan includes the Safety system. HR people log and sign off changes; staff confirm the ones they're on.
The Process changes screen
- 1Log a changeHR people.
- 2The four countsWaiting sign-off, still to retrain, in retraining and closed.
- 3Needs attentionChanges ready to sign off, and who is still to confirm.
- 4A changeIts stage, its kind and how many people are retrained.
Step by step
- 1
Log the change
Go to HR & Safety, then Process changes, and press Log a change.
- 2
Say what changed
Say what changed and why, and write down the safety check done before it. Link the risk it's checked against if there is one.
- 3
Say where it applies
Pick the first job it applies from, the area, who introduced it, what it was tested on, and the earlier change it replaces if there is one.
- 4
Tick who needs retraining
Tick everyone it affects, and pick an induction to redo if they need one. Press Add to the register.
- 5
Sign it off
Open the change and press Sign off this change. Tick that you're satisfied with the safety check and sign.
You’ll seeEveryone on the list is told and asked to confirm.
- 6
Retrain and confirm
Show each person the new way of working. They open Changes for you, tick that they've been shown it and sign.
You’ll seeWhen the last one confirms, the change closes itself.
Process changes list
| Part | What it does |
|---|---|
| Waiting on you, Log a change | Your own changes to confirm, and starting a new one (HR people). |
| Waiting sign-off, Still to retrain, In retraining, Closed | Where changes are up to, and how many people still owe a confirmation. |
| Needs attention | Changes ready to sign off, changes missing their safety check, and who's still to confirm. |
| Waiting for sign-off, Retraining under way, Closed | Each change with its stage, kind, how many retrained, and the people on it. |
Logging a change
| Part | What it does |
|---|---|
| What changed, What kind, The detail, Why | A process, a machine, a chemical, the layout, or something else. |
| First job it applies from | Type a job number or a customer and pick the job. Jobs from that one on are done the new way. |
| Area or department, Who introduced it, Replaces an earlier change | Where it applies (or Whole shop), who brought it in, and the earlier change this one takes over from. |
| What it was tested on | What it was tried out on before it went in. |
| The safety check done first | Must be written down before the change can be signed off. |
| Risk it's checked against, Induction to redo, Came from an incident | Optional links. An induction here is given to everyone on the list to redo. |
| Who needs retraining | Tick the people it affects. |
One change
| Part | What it does |
|---|---|
| Draft, Signed off, Retraining, Closed | The stages, with dates. |
| The change | The detail, why, area or department, the first job (opens the job), what it was tested on, who introduced it and the safety check. Replaces and Replaced by link the earlier and later changes both ways. |
| Sign off this change | Your name, a note, a tick that you're satisfied with the safety check, and your signature. Everyone on the list is then asked to confirm. |
| Your retraining | For people on the list: tick that you've been shown the new way of working, sign and press Sign. |
| Who needs retraining | Each person: Confirmed with their signature, Waiting, or After sign-off. |
| Edit this change, Close it without everyone | Change it before it closes, or close it with a reason. |
Tips
A change with nobody on the retraining list closes the moment it's signed off.
People added after sign-off are told straight away and given the induction.
Link the earlier change this one replaces, so each links to the other.
Watch out
The safety check must be written down before the change can be signed off.
Closing a change without everyone needs a reason, and that reason stays in its history.
A signature says someone was shown the new way. It doesn't replace showing them, so do the retraining first.
