Sign OS
  • Features
  • Trade Link
  • Integrations
  • Compare
  • Pricing
  • Guides
  • About
☰
  • Features
  • Trade Link
  • Integrations
  • Compare
  • Pricing
  • Guides
  • About
  • Sign in
Sign inStart free trial
Sign OS

Job management software for sign shops. Built in Victoria by someone who’s done the jobs.

Product

  • All features
  • Trade Link
  • Pricing
  • Integrations
  • What's new
  • Status

Compare

  • vs shopVOX
  • vs CoreBridge
  • vs SignTracker
  • vs Hexicom
  • vs Cyrious Control
  • vs Ordant
  • vs PrintPLANR
  • vs WorkflowMax
  • vs Printavo
  • vs tradie job apps

Resources

  • Sign shop guides
  • Free templates
  • Overhead calculator
  • Landed cost calculator
  • Blog
  • Help centre

Company

  • About
  • Contact
  • Your data
  • Terms
  • Privacy
  • For installers
  • For suppliers
© 2026 Sign OS · Run by Todd Farrell, sole trader · Victoria, Australia · ABN 50 613 736 709Prices in AUD · Sign in
Help/HR & Safety/Keep a risk register
HR & Safety30 of 32How-to

Keep a risk register

How do I keep a list of what could go wrong, how bad it is and what we do about it?

For
HR people, and staff for the risks they look after
Where to find it
Sidebar › HR & Safety › Risk register
Takes
10 minutes a risk
You need
A plan with the Safety system

What it is for

The risk register is what could go wrong in your shop and on installs, how likely it is, how bad it would be, and what's in place to stop it. Each risk is rated before and after its controls, has an owner and a review date, and job SWMS take their ratings from here.

After this you can

  • Add a risk and rate it before and after its controls
  • List the controls in place, strongest first
  • Give someone a control still to do, with a date
  • Record a review when it comes due
  • Read the heat map

Before you start

  • Your shop's plan includes the Safety system. HR people see every risk; staff see the risks they look after.

The Risk register screen

HR & Safety›Risk register
The Risk register screen with four numbered parts
  1. 1Add a riskHR people who can change records.
  2. 2The four countsExtreme, high, reviews overdue and controlled. Click one to filter the list.
  3. 3Where the risks sitHow likely up the side, how bad along the bottom, with the number of risks in each square.
  4. 4Now, with controls and Before controlsSwitches the map between the two ratings.

Step by step

  1. 1

    Add a risk

    Go to HR & Safety, then Risk register, and press Add a risk. Start with the big ones: working at height on installs, the router, the laminator, solvents, the forklift.

  2. 2

    Rate it before controls

    Describe what could happen, then pick how likely it is and how bad it would be before any controls.

    You’ll seeThe rating and what to do about it show as you pick.

  3. 3

    Say how it was assessed

    Record who identified it, who assessed it and how.

  4. 4

    List the controls and rate it again

    List the controls already in place, strongest first, then rate it again with them in place.

  5. 5

    Give it an owner and a review date

    Pick who looks after it and a review date, and press Add to the register.

    You’ll seeThe owner is told.

  6. 6

    Add controls still to do

    On the risk's page, add each control not in place yet under Still to do, with who's doing it and by when.

  7. 7

    Review it

    When a review is due, open the risk, check the controls still work, and press Record the review.

    You’ll seeThe owner and HR are reminded two weeks before.

Top of the page

PartWhat it does
Add a riskHR people who can change records.
Extreme, High, Reviews overdue, ControlledClick one to filter the list.
Where the risks sit (5×5 heat map)Likelihood from Rare to Almost certain up the side, consequence from Insignificant to Catastrophic along the bottom. Switch between Now, with controls and Before controls. Click a square to list its risks. Low 1–4, Medium 5–8, High 9–15, Extreme 16–25; score is how likely × how bad.
Needs attentionExtreme risks (stop the work until controlled), reviews overdue and reviews due soon, each with Review.

Risks list

PartWhat it does
FiltersOpen, Controlled, Closed; rating; review due; and owner.
Each riskWhere and which task, the rating before and after controls (for example High 12 to Medium 6), the owner, and the review date or Overdue.

Adding or editing a risk

PartWhat it does
What could happen, Where, Which task, Who's exposedFor example 'Hand caught in the laminator rollers'.
How it was found and assessedWho identified it and who assessed it (picked from your staff), and How was it assessed: Inspection, Investigation, Talking to workers, Records or Other.
How bad is it before any controlsHow likely and how bad, 1 to 5 each. The rating and what to do about it show as you pick.
Controls already in placeStrongest first: Eliminate, Substitute, Isolate, Engineering, Administrative, PPE. Up to 20. Controls still to do go on the risk's page once it's saved.
How bad is it with the controlsThe rating after. It can't be higher than before.
Who looks after it, Next review, StatusThe owner, the review date (Use it suggests one: a month for extreme up to a year for low), and Open, Controlled or Closed.

One risk

PartWhat it does
Who looks after it, Where, Which task, Who's exposed, Identified by, Assessed by, How it was assessedThe facts across the top.
RatingThe rating before controls and with controls, the action to take, and both marked on a small matrix.
Already in placeThe six rungs of the ladder, strongest at the top, green where you have controls.
Still to doControls not in place yet, each with who's doing it, by when, and the date it was done. The person is told, reminded three days before and on the day, and ticks it off under My safety actions. HR people add them.
Record a reviewWhat you found and the next review date. The owner or HR can record it.
LinkedThe hazard report or incident it came from, and any process change checked against it.

How a rating is worked out

Score is how likely times how bad, each from 1 to 5.

Before controls: Likely, Catastrophic4 × 520, Extreme
With controls: Unlikely, Major2 × 48, Medium
Shown on the list asExtreme 20, then Medium 8 after controls

Low is 1 to 4, Medium 5 to 8, High 9 to 15 and Extreme 16 to 25.

Tips

Name risks the way your SWMS hazards are written and they match up by themselves.

Use it beside the review date suggests one: a month for extreme, up to a year for low.

Switch the heat map between Now, with controls and Before controls, and click a square to list its risks.

Watch out

An extreme rating means stop the work until the risk is removed or brought under control.

A risk with no rating after controls counts at its before rating, everywhere.

The rating after controls can't be higher than before.

The matrix is the one the SWMS uses: a score of 9 is High. If you bring across a register that called 9 Medium, check those ratings as you enter them.

Sign OS doesn't tell you what your risks are or whether your controls are enough. That judgement is the shop's, so ask your regulator or adviser if you're unsure.

Open this in Sign OS →

Where to next

Next step

Fill a job's SWMS from your registersRisk ratings, licence boxes and the SDS box filled in from HR & Safety.

Related

Report a hazard, and deal with itAnyone reports from their phone; the safety contact records what was done and gives out actions.Log a process change and retrain peopleWhat changed, the safety check, who signed it off, and who needs retraining.Keep the regulations and codes of practice you work toYour own library of regulations, codes of practice and standards, with a reminder to check for newer versions.
Also found by searchingrisk registerrisk assessmentrisk matrix5x5heat maplikelihoodconsequencehierarchy of controlreview

On this page

  1. The Risk register screen
  2. Step by step
  3. Top of the page
  4. Risks list
  5. Adding or editing a risk
  6. One risk
  7. How a rating is worked out
  8. Tip and watch out
  9. Where to next