Run an improvement plan
How do I run an improvement plan with objectives, check-ins and an outcome we both sign?
- For
- HR people, and department leads if the shop allows it
- Where to find it
- SidebarHR & SafetyReviews & plans
- Takes
- 20 minutes to start, 5 minutes a check-in
- You need
- A plan with HR, and change rights on HR & safety records or a department lead role the shop lets run reviews
What it is for
A proper improvement plan: why it's needed, a review period, urgent or ongoing, and objectives. Each objective has the actions agreed, how it's measured and dated check-ins, where the person adds their note and the manager comments and rates progress. At the end the manager records the outcome and you both sign. It can link back to the review or conduct record that led to it. Only HR people, department leads if you allow it, and the person once it's shared see it.
After this you can
- Start a plan with a review period, a manager and objectives
- Add dated check-ins and record progress at each one
- Record the outcome and collect both signatures
- Link the plan to the review or conduct record that led to it
Before you start
- Your shop's plan includes HR. Starting and running plans needs change rights on HR & safety records, or a department lead role when your shop allows leads to run reviews.
- Improvement plans written as conduct records before this screen came in stay on the Conduct tab, read-only, exactly as written and signed.
Improvement plans on the Reviews screen
- 1Start an improvement planStarts a plan for anyone you may review.
- 2Improvement plansEach plan running, with its stage.
Step by step
- 1
Start a plan
Go to HR & Safety, then Reviews & plans, and press Start an improvement plan. From a review or conduct record, use Start a plan from this.
- 2
Set the period and the manager
Pick who it's for, the manager, the start and end dates, and whether it's urgent or ongoing.
- 3
Say why it's needed
Write the facts behind it under Why the plan is needed.
- 4
Add the objectives
Add each objective with the actions agreed and how it's measured. Press Add another objective for more.
- 5
Add check-ins
Open the plan and add dated check-ins under each objective.
- 6
Share it and run the check-ins
Share the plan with them. At each check-in they add their note, and the manager adds a comment and a rating.
- 7
Record the outcome and sign
At the end, record the outcome and what happens next. Then they sign, and the manager signs.
You’ll seeThe plan shows Signed by both. Press Print to keep a copy as a PDF.
Start an improvement plan
| Part | What it does |
|---|---|
| Who it's for, Manager | The manager runs the check-ins and gets the reminders. It's an HR person or a lead of their department when your shop allows it. |
| Starts, Ends, Urgent or ongoing | The review period, and whether it's urgent (a safety or serious issue) or ongoing development. |
| Why the plan is needed | The facts behind it. |
| What led to it | On their file: link a review or conduct record of theirs. |
| Objectives | Each with the objective, the actions and how it's measured. Add another objective adds more. |
| Share with them now | On, they're told and can see it and add their note at each check-in. |
| Writing guide | What a fair plan covers and when to get advice. Sign OS doesn't write the plan for you. |
A plan
| Part | What it does |
|---|---|
| Stage, Print | Not shared yet, Running, Period over, outcome to record, Outcome recorded, waiting to sign, or Signed by both; and a page to print or save as a PDF. |
| The plan, Edit | The period, urgent or ongoing, the manager, whether it's shared, and why it's needed. Came from links to the review or conduct record. |
| Objectives, Edit, Add an objective | Each objective with its actions and how it's measured. Removing one needs at least one left. |
| Check-ins | Dated check-ins under each objective. The person writes their note; the manager sets the date, a rating (Not on track, Some progress, On track) and a comment. The manager is reminded two days before and on the day. |
| Final outcome | Objectives met, Partly met, Not met or Stopped early, the date it closed and what happens next. The manager is reminded a week before the plan ends and on the day. |
| Comments and signature | The person's own comments, then once the outcome is recorded, their signature. |
| Manager's signature | Signs once the outcome is recorded and the plan is shared. Once either signs, the plan is locked. |
| Remove plan | HR only. It's kept, stops reminding, and can be put back from Removed on their Reviews tab. |
Tips
Every objective needs a way to measure it that you can both check.
Offer support or training alongside what's asked.
The manager is reminded two days before each check-in and on the day, and a week before the plan ends.
Watch out
If the outcome could lead to a warning or ending their employment, get advice first.
Sign OS doesn't write the plan for you. The writing guide says what a fair plan covers and when to get advice.
Once either of you signs, the plan is locked.
Only HR people, department leads if you allow it, and the person once it's shared can see a plan.
