Sign OS
  • Features
  • Trade Link
  • Integrations
  • Compare
  • Pricing
  • Guides
  • About
☰
  • Features
  • Trade Link
  • Integrations
  • Compare
  • Pricing
  • Guides
  • About
  • Sign in
Sign inStart free trial
Sign OS

Job management software for sign shops. Built in Victoria by someone who’s done the jobs.

Product

  • All features
  • Trade Link
  • Pricing
  • Integrations
  • What's new
  • Status

Compare

  • vs shopVOX
  • vs CoreBridge
  • vs SignTracker
  • vs Hexicom
  • vs Cyrious Control
  • vs Ordant
  • vs PrintPLANR
  • vs WorkflowMax
  • vs Printavo
  • vs tradie job apps

Resources

  • Sign shop guides
  • Free templates
  • Overhead calculator
  • Landed cost calculator
  • Blog
  • Help centre

Company

  • About
  • Contact
  • Your data
  • Terms
  • Privacy
  • For installers
  • For suppliers
© 2026 Sign OS · Run by Todd Farrell, sole trader · Victoria, Australia · ABN 50 613 736 709Prices in AUD · Sign in
Help/HR & Safety/Run an improvement plan
HR & Safety15 of 32How-to

Run an improvement plan

How do I run an improvement plan with objectives, check-ins and an outcome we both sign?

For
HR people, and department leads if the shop allows it
Where to find it
Sidebar › HR & Safety › Reviews & plans
Takes
20 minutes to start, 5 minutes a check-in
You need
A plan with HR, and change rights on HR & safety records or a department lead role the shop lets run reviews

What it is for

A proper improvement plan: why it's needed, a review period, urgent or ongoing, and objectives. Each objective has the actions agreed, how it's measured and dated check-ins, where the person adds their note and the manager comments and rates progress. At the end the manager records the outcome and you both sign. It can link back to the review or conduct record that led to it. Only HR people, department leads if you allow it, and the person once it's shared see it.

After this you can

  • Start a plan with a review period, a manager and objectives
  • Add dated check-ins and record progress at each one
  • Record the outcome and collect both signatures
  • Link the plan to the review or conduct record that led to it

Before you start

  • Your shop's plan includes HR. Starting and running plans needs change rights on HR & safety records, or a department lead role when your shop allows leads to run reviews.
  • Improvement plans written as conduct records before this screen came in stay on the Conduct tab, read-only, exactly as written and signed.

Improvement plans on the Reviews screen

HR & Safety›Reviews & plans
Improvement plans on the Reviews screen with two numbered parts
  1. 1Start an improvement planStarts a plan for anyone you may review.
  2. 2Improvement plansEach plan running, with its stage.

Step by step

  1. 1

    Start a plan

    Go to HR & Safety, then Reviews & plans, and press Start an improvement plan. From a review or conduct record, use Start a plan from this.

  2. 2

    Set the period and the manager

    Pick who it's for, the manager, the start and end dates, and whether it's urgent or ongoing.

  3. 3

    Say why it's needed

    Write the facts behind it under Why the plan is needed.

  4. 4

    Add the objectives

    Add each objective with the actions agreed and how it's measured. Press Add another objective for more.

  5. 5

    Add check-ins

    Open the plan and add dated check-ins under each objective.

  6. 6

    Share it and run the check-ins

    Share the plan with them. At each check-in they add their note, and the manager adds a comment and a rating.

  7. 7

    Record the outcome and sign

    At the end, record the outcome and what happens next. Then they sign, and the manager signs.

    You’ll seeThe plan shows Signed by both. Press Print to keep a copy as a PDF.

Start an improvement plan

PartWhat it does
Who it's for, ManagerThe manager runs the check-ins and gets the reminders. It's an HR person or a lead of their department when your shop allows it.
Starts, Ends, Urgent or ongoingThe review period, and whether it's urgent (a safety or serious issue) or ongoing development.
Why the plan is neededThe facts behind it.
What led to itOn their file: link a review or conduct record of theirs.
ObjectivesEach with the objective, the actions and how it's measured. Add another objective adds more.
Share with them nowOn, they're told and can see it and add their note at each check-in.
Writing guideWhat a fair plan covers and when to get advice. Sign OS doesn't write the plan for you.

A plan

PartWhat it does
Stage, PrintNot shared yet, Running, Period over, outcome to record, Outcome recorded, waiting to sign, or Signed by both; and a page to print or save as a PDF.
The plan, EditThe period, urgent or ongoing, the manager, whether it's shared, and why it's needed. Came from links to the review or conduct record.
Objectives, Edit, Add an objectiveEach objective with its actions and how it's measured. Removing one needs at least one left.
Check-insDated check-ins under each objective. The person writes their note; the manager sets the date, a rating (Not on track, Some progress, On track) and a comment. The manager is reminded two days before and on the day.
Final outcomeObjectives met, Partly met, Not met or Stopped early, the date it closed and what happens next. The manager is reminded a week before the plan ends and on the day.
Comments and signatureThe person's own comments, then once the outcome is recorded, their signature.
Manager's signatureSigns once the outcome is recorded and the plan is shared. Once either signs, the plan is locked.
Remove planHR only. It's kept, stops reminding, and can be put back from Removed on their Reviews tab.

Tips

Every objective needs a way to measure it that you can both check.

Offer support or training alongside what's asked.

The manager is reminded two days before each check-in and on the day, and a week before the plan ends.

Watch out

If the outcome could lead to a warning or ending their employment, get advice first.

Sign OS doesn't write the plan for you. The writing guide says what a fair plan covers and when to get advice.

Once either of you signs, the plan is locked.

Only HR people, department leads if you allow it, and the person once it's shared can see a plan.

Open this in Sign OS →

Where to next

Before this

Run performance reviewsYour own review templates, a self-review, scores side by side, their comments and both signatures.Record health checks and conductHealth monitoring, warnings and other conduct records on a person's file, seen only by HR.

Related

Keep a staff file for everyoneEmployment details, contacts, documents, and every tab on a person's file.
Also found by searchingimprovement planperformance improvement planpipobjectivescheck-inperformanceunderperformanceoutcomesign

On this page

  1. Improvement plans on the Reviews screen
  2. Step by step
  3. Start an improvement plan
  4. A plan
  5. Tip and watch out
  6. Where to next