Sign OS
PricingSign inStart free demo

© 2026 Sign OS · The operating system for sign manufacturers

Built in Victoria, Australia · Prices in AUD

Help/Purchasing & contractors/Track work that has left the building

Track work that has left the building

One board for every step at a supplier, and who is late.

What this is for

Once work leaves your shop it stops being visible on the floor — nobody walks past it. The outsource board is the one screen that shows every step currently with a supplier, what stage it is at, and which ones are past the date they promised.

Track work that has left the building — the screen in Sign OS

Step by step

  1. 1

    Open Purchasing → Outsourcing.

  2. 2

    Each card is one job step at a supplier, grouped by where it has got to: waiting to send, sent, acknowledged, dispatched, and back with you.

  3. 3

    Anything past its promised date is flagged. Chase from here rather than finding out when the job is due.

  4. 4

    Click through to the purchase order for the full history, or to the job to see where the step sits in the run.

Open this in Sign OS →

Tips & gotchas

  • →A supplier who has not acknowledged is not the same as a supplier who is late — the board separates the two, because one needs a phone call and the other needs a nudge.
  • →The dates come from the supplier's own answers on their link, not from what you assumed when you sent it.

Related guides

Send a job step out to a supplierHand a step you cannot do in-house to a trade supplier, and keep it on your board.Let a supplier confirm an order without an accountA private link where the supplier acknowledges, promises a date, and picks up the artwork.Monitor job health & bottlenecksSpot late and at-risk jobs before they become a problem.