Pull back or fix a proof
The wrong proof went out, or got approved. How do I fix it?
- For
- Whoever manages artwork
- Where to find it
- SidebarJobsopen the jobApprovals
- Takes
- 2 minutes
- You need
- Permission to action proofs
What it is for
Sometimes a proof goes out before it should, and sometimes the wrong one gets approved. Neither is a dead end. Production stays blocked until it is sorted, which is the point.
After this you can
- Pull back a proof before the customer answers
- Withdraw an approval given in error
- Clear a proof that was approved with changes
An approved proof, on the job's Approvals tab
Point at a number in the list and it lights up on the picture.
- 1ArchiveTakes an old approval off the tab, so it stops holding up release.
- 2Approved in error?Says what withdrawing does.
- 3Withdraw approvalSends the proof back to pending and blocks production again. The customer's signed approval stays on the record.
- 4Version 1Each version, the file, and how many times the customer opened it.
Step by step
- 1
Open Approvals
Open the job's Approvals tab.
- 2
To pull one back
Press Send again for approval and Revoke the link the customer has not answered.
- 3
To undo a wrong approval
Press Withdraw approval and say why.
- 4
To replace the artwork
Upload a new version. The old one is replaced and its link stops counting.
- 5
After approved with changes
Read the customer's notes, make the changes, and press the Changes actioned button, which releases it for production.
Job, Approvals tab
| Part | What it does |
|---|---|
| Send again for approval, Revoke | The send window lists the links already sent. Revoke on one the customer hasn't answered pulls it back. |
| Withdraw approval, reason | An approval given wrongly goes back to pending and production waits. |
| New version | Supersedes the old; the old link stops counting. |
| Approved with changes, Changes actioned, release for production | The customer's notes, a box for what you did about them, and the button that clears it for production. |
| Archive | Takes an old approval off the tab, such as one replaced by a proof sent as its own approval. It stops holding up release. |
Watch out
Withdrawing blocks production again until the proof is approved.
Archive is for an approval that has been replaced. It does not approve anything.
